SERVICES

COMPREHENSIVE CONSULTING SERVICES

We offer a wide range of data consulting services to help your company optimise its operations and achieve its business objectives. Our services range from site selection to the ongoing operation of your data centers.

Specialised Data Center Consulting - Design, Implementation and Optimisation

We transform your critical infrastructure into a high-performance strategic asset

In today’s digital age, your data center is the heart of your operations. We offer comprehensive consulting services specialising in data centers, combining technical expertise with strategic vision to ensure that your infrastructure is secure, efficient and scalable.

Our services include:

  • Complete analysis and audit of existing infrastructure
  • Architecture design in accordance with Uptime Institute TIER I-IV standards
  • Capacity planning and scalability strategies
  • Resilience assessment and business continuity planning
  • Regulatory compliance (ISO, TIA, EN, local regulations)
Key benefits:
R

Reduction in TCO (Total Cost of Ownership) by up to 30%

R
Improved availability and uptime
R
Optimisation of space and energy resources
R
Preparation for future technologies and workloads

Electrical Access and Distribution Line Consulting for Data Centers

We guarantee access to secure, scalable electrical power that is ready for critical loads

Access to a robust and scalable electricity supply is one of the most critical factors in the development and operation of a data center. Our specialist consultancy service for electricity distribution lines supports operators and developers from the initial stages of the project, ensuring that supply points are obtained that are adequate for the high energy demands of these infrastructures.

We carry out studies of electricity supply point requests with distribution companies and Red Eléctrica de España (REE), assessing the available network capacity and defining the best connection alternatives. We efficiently analyse the possible routes for power lines, optimising layouts, deadlines and costs, always based on criteria of reliability and resilience.

Our experience includes the successful management of data center projects exceeding 1 GW of total processed power, guaranteeing viable technical solutions in line with industry standards.

Areas of expertise:

  • Access and electrical connection studies for data centres
  • Processing of high-power supply points (distributors/REE)
  • Definition and optimisation of MV and HV line routes
  • Network capacity analysis and reinforcement solutions
  • Technical and economic studies of redundant power lines
  • Technical coordination with network operators, engineering firms and competent bodies
Our methodology:
=
Analysis of energy demand and Data Center scalability
=
Assessment of network capacity and connection alternatives
=
Definition of resilient and redundant electrical layouts
=
Economic estimation and investment planning
=
Technical support until supply is obtained and validated

Energy Optimisation and Sustainability in Data Centers

Reduce your PUE (Power Usage Effectiveness) and operating costs

Energy efficiency is not just a matter of sustainability, it is an economic imperative. We implement proven strategies to maximise the performance of your data center while minimising its energy and operational footprint.

Comprehensive approach to efficiency:

  • PUE/DCiE analysis and advanced thermal mapping
  • Cooling optimisation (free cooling, containment, dynamic management)
  • Server virtualisation and consolidation
  • Intelligent load management and scheduling
  • Implementation of renewable energies and heat recovery
Typical results:
R
PUE reduced to 1.2-1.4 in optimised installations
R
Energy savings of 25-40%
R
Extended equipment lifespan
R
Improved available capacity without physical expansion
R
LEED, BREEAM, Energy Star certifications

TEST FIT Design of Data Centers – Optimal Implementation from the Plot

We ensure the technical, operational and scalable fit of the Data Center from the conceptual phase onwards

The TEST FIT design is a key phase in the development of a Data Center, as it allows the technical, operational and growth viability of the project on a specific plot of land to be validated at an early stage. Our Data Center TEST FIT Design service analyses the optimal implementation of the infrastructure, ensuring the correct coexistence of critical and non-critical systems, as well as the maintainability and future evolution of the asset.

We carry out the preliminary implementation of the data centre on the site, defining the location and relationship between the different functional areas. A clear distinction is made between critical areas, which are essential for service continuity, and non-critical areas, which are necessary for the overall operation of the complex.

In the critical area, the implementation of the following is being studied:

  • Power generation systems (gensets and fuel systems)
  • LV/MV power distribution and transformer stations
  • Fibre and telecommunications infrastructure
  • Critical cooling systems (chillers, dry coolers, CRAH/CRAC)
  • Mechanical and electrical galleries and installations
  • Data halls and associated technical areas

In the non-critical area, the following are designed and implemented:

  • Offices and administrative areas
  • Loading docks and logistics
  • Support areas, warehouses and workshops
  • Auxiliary service areas

The TEST FIT considers operational, maintainability and security requirements, ensuring adequate access, segregation of flows, redundancies, and sufficient space for maintenance and equipment replacement. It is also designed with the future growth of the Data Center in mind, allowing for modular expansions without affecting existing operations.

TEST FIT phases:

  1. SITE ANALYSIS – Analysis of the plot, urban planning constraints and accesses
  2. FUNCTIONAL LAYOUT – Functional implementation of critical and non-critical areas
  3. CRITICAL SYSTEMS FIT – Integration of electrical, mechanical and telecommunications systems
  4. OPERATION & MAINTENANCE REVIEW – Validation of operability and maintainability
  5. GROWTH & SCALABILITY PLAN – Growth strategy and expansion phases
Differential advantages:
R
Early validation of the technical feasibility of the Data Center
R
Risk reduction in later design and construction phases
R
Optimisation of space, routes and costs
R
Design aligned with Tier standards and industry best practices
R
Solid foundation for conceptual and detailed design

RIBA Architectural Design for Technical Infrastructure

Design excellence through the RIBA Plan of Work 2020 methodology
We apply the RIBA (Royal Institute of British Architects) methodology – a global benchmark in architectural project management – specifically adapted to technical infrastructure and data centres, ensuring quality, control and compliance at every stage.
Adapted RIBA stages:

  • 0. STRATEGIC DEFINITION – Strategic definition and feasibility
  • 1. PREPARATION & BRIEF – Project preparation and brief
  • 2. CONCEPT DESIGN – Conceptual design and option studies
  • 3. SPATIAL COORDINATION – Spatial and volumetric coordination
  • 4. TECHNICAL DESIGN – Technical design and specifications
  • 5. MANUFACTURING & CONSTRUCTION – Manufacturing and construction
  • 6. HANDOVER & CLOSE OUT – Project handover and closure
  • 7. IN USE – Post-occupancy support and optimisation
Our added value:
R
Seamless integration between architecture and engineering
R
Stakeholder management and regulatory approvals
R
Quality control through gate reviews
R
Level 2 BIM (Building Information Modelling) documentation
R
Compliance with international standards

Retrofit & Conversion of building into High-Performance Data Centers

Enhance the value of your real estate assets by converting them into digital infrastructure

Not all data centers need to be built from scratch. We specialise in transforming existing buildings—offices, industrial warehouses, even shopping centres—into modern, efficient, and certifiable data centers.
Conversion process:

  • FEASIBILITY STUDY – Structural, electrical and climate analysis
  • ARCHITECTURAL ADAPTATION – Modifications for critical loads
  • CRITICAL INFRASTRUCTURE – Electrical, mechanical, security
  • TECHNOLOGICAL INTEGRATION – IT systems and connectivity
  • CERTIFICATION AND COMMISSIONING

Success stories:

We have converted more than 50,000 m² into TIER III data centres with ROI in less than 3 years.

Convertible buildings:
=
Industrial and logistics warehouses
=
Obsolete office buildings
=
Shopping centres and retail outlets
=
Disused military installations
=
Telecommunications infrastructure